pure brass bowl with silver plating and mirror polishing

FOB Reference Price:Get Latest Price
  • 50 - 499 Pieces
    US $50.00
  • >=500 Pieces
    US $45.00
Report Suspicious Activity
Overview
Quick Details
Dinnerware Type:
Bowls
material:
100% pure brass
plating:
true silver
process:
mirror polish
Supply Ability
Supply Ability:
5000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
normal export package or customized
Port
Ningbo/Shanghai
Lead Time :
35days after deposit
Company Information

Our Capabilities

Shaoxing Huida Metal Product Factory are a professional manufacture 

in all kinds of metal spinning/stamping products more than ten years.

ServicesMetal spinning,metal stamping,deep drawn stamping,and forming service
Field productKitchen utensils,Lamp shade,Reflectors,Fan Parts,Separator Parts,Case Bottoms
Barrel,Bucket parts,Thin-walled tubular parts,Industry container
Material Alumium,Alumium alloy,Copper,Brass,Carbon steel,cold rolled steel,stainless steel
Maximum parts size800mm in Diameter
Material thickness rangesfrom 0.2mm to 5mm
Typical tolerance rangesfrom ± 0.1mm-0.2mm
Tooling lead time20-25 working days
Production time25-35 working days per to order requirement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Metal spinning

Metal Spinning is pretty close to what its name implies. Metal parts are formed using a combination of pressure and high-speed rotation. It can be done in two ways: by hand using fulcrum and lever techniques or by highly automated CNC-controlled spinning lathes, which improve cycle times, tolerances, surface conditions and cost. It is used to create axially symmetric parts such as cones and cylinders.

 

 

 

 

FAQ
Q: What do you need to provide a quote?

A: Pls provide drawing(2D/3D/CAD) of product and material/quantity/surface 

treatment information.    

Q: Are you trading company or manufacture ?

A: We are a manufacture for 11 years.We warmly welcome you to visit our factory 

and will arrange to pick you up.

Q: If you could sign and follow NDA(Non-disclosure Agreement)?    

A: Yes,we have many cooperated customers signed with NDA,so this is why we have 

not display more product.

Q: How long is your delivery time?

A:Tooling time is 20-25 days after full tool payment.Sampling time will 

be 3-8 days after tool are ready.

Bulk production will be 25-35 days depend on order quantity and surface

treatment requirement.

Q:What is your MOQ?
A:MOQ 50 pcs for each item.
Q:What are your payment terms?

A:We accept T/T, Paypal, Western union. 50% deposit in advance and the balance 

before shipping.

Q:What is your shipping ways?

A:We can ship the samples/bulk by DHL,UPS,FEDEX courier, by air/sea. It is up to 

your quantity and your requirements.